Zhejiang Kone plant expansion project environmental impact assessment information publicity

News

Zhejiang Kone plant expansion project environmental impact assessment information publicity

2020-02-28 09:33

Zhejiang Kone plant expansion project environmental impact assessment information publicity

Zhejiang Tongli New Materials Science and Technology Co., Ltd. has an annual output of 1 million pieces of auto parts, 300,000 pieces of plastic for electronics and electrical appliances, 300,000 pieces of plastic for daily use, 2,000 tons of PVC particles, 3,000 tons of reclaimed medical waste plastic and 1,000 tons of PVC pelleting, and information on environmental impact assessment of plant expansion project is published

I. Basic information of the construction project

Project name: Zhejiang Tongli New Material Technology Co., LTD., with annual output of 1 million pieces of auto parts, 300,000 pieces of plastic for electronic appliances, 300,000 pieces of plastic for daily necessities, 2,000 tons of PVC particles, 3,000 tons of reclaimed medical waste plastic and 1,000 tons of PVC granule, and plant expansion project

Project Overview:

Zhejiang tongli new material technology co., LTD located in taizhou jiaojiang three entrepreneurial road 21, companies in the original factory plans to invest 18.32 million yuan to implement technical modification projects, increase injection molding machine 12 units, double screw extrusion machine 3 sets of equipment, with independent research and development of advanced technology and process, the implementation of annual output of 1 million pieces of auto parts, electronic plastic parts, 300000 300000, daily necessities, plastic, PVC 2000 tons, 3000 tons of recycled medical waste plastics particles and 1000 tons of PVC granules and plant expansion project.

Ii. Distribution of major environmentally sensitive targets within the scope of eia

Within the scope of EIA, the main environmental sensitive targets are Dongxing Village in the west of the project (about 1.24km away from the project boundary) and Jiaojiang Farm residential area in the southwest (about 1.48km away from the project boundary).

Iii. Major environmental impact prediction

Construction period: the construction period of this project is mainly for the installation and operation of equipment. Therefore, the project is basically unaffected by the construction period, and the impact of the project is mainly reflected in the operation stage.

Operation period: the waste water mainly includes production waste water and domestic sewage, etc. The waste water is respectively pre-treated to the Dana pipe standard and then incorporated into the municipal sewage pipe network, and discharged after it reaches the treatment standard in Taizhou Water Treatment development Co., LTD. The waste gas mainly consists of unpacking feeding dust, crushing dust, granulating extrusion waste gas and injection molding waste gas, and canteen lampblack. The waste gas is collected and processed by corresponding waste gas treatment facilities and discharged in the upper air, which will not cause obvious impact on the surrounding environment. Solid waste is mainly for the settlement of dust ash, mesh filter, waste packing material, waste activated carbon, paper labels for sorting waste, waste, scrap the cork, wastewater treatment, sludge and living garbage, solid waste dumps, factory construction specification, living garbage pickup processing by the sanitation department, the comprehensive utilization of solid waste classified collection, and proper disposal, through recycling, harmless handling, reduce the impact on the environment. The noise is mainly the running noise of the equipment. The noise at the factory boundary reaches the standard by taking measures such as optimizing the layout, sound insulation and greening. Reasonable prevention and control measures should be taken to discharge all pollutants up to the standards, and the project will have little impact on the surrounding environment.

Major environmental protection measures to be taken, environmental risk prevention measures and expected effects

Operation period: the production waste water and domestic sewage are respectively pre-treated to the Dana pipe standard and then incorporated into the municipal sewage pipe network, and discharged after being treated to the standard by Taizhou Water Treatment development Co., LTD. The waste gas is collected and treated by the corresponding waste gas treatment facilities and discharged at high altitude. Select low noise equipment, sound insulation noise reduction for high noise equipment, reduce the impact of noise. Solid waste shall be collected and disposed of separately in strict accordance with relevant regulations. In strict accordance with the requirements to do a good job of groundwater seepage-proofing work, do a good job of tracking monitoring work. Establish emergency emergency system and set up emergency pool. The prevention and control measures adopted in this project are technically and economically feasible, which can ensure the stable discharge of all kinds of pollutants up to the standards, and the discharged pollutants will not cause obvious impact on the surrounding environment.

5. Preliminary conclusions of environmental impact assessment

The impact of various pollutants generated by the project on the surrounding environment is within the acceptable range and the environmental risk is within the acceptable level after the treatment of corresponding measures. This project basically conforms to the principle of environmental protection approval.

Content of soliciting opinions

The object, scope and main matters of soliciting opinions: The relevant groups and individuals within the scope of the environmental impact assessment of the project may put forward their opinions and Suggestions on the environmental protection countermeasures of the project or other issues related to the environmental impact of the construction project, and explain the reasons. For further information about the project, please visit Zhejiang Taicheng Environmental Science and Technology Co., Ltd. for the relevant EIA documents during the period of this announcement.

Public feedback channels: The public can send valuable comments and Suggestions to Zhejiang Taicheng Environmental Technology Co., LTD., Zhejiang Kone New Material Technology Co., LTD. Or the administrative department of environmental protection by letter, telephone, fax, E-mail, etc. For better feedback, please leave your specific contact information.

1. Construction Unit: Zhejiang Tongli New Materials Technology Co., LTD

Contact person: Mr. Zhang Tel: 18857691288

Address: No. 21, Sanjia Chuangye Road, Jiaojiang District, Taizhou 318000

2. Eia Unit: Zhejiang Taicheng Environmental Technology Co., LTD

Qualification Certificate No. : NATIONAL Environmental Assessment Certificate No. B no. 2002

Contact: Digong Tel: 0576-89811033 Fax: 0576-89811031 Email: 446206664@qq.com

Address: 23rd Floor, Building 4, Wanda Plaza, Taizhou Economic Development Zone, 318000

3. Environmental protection examination and approval Department: Administrative Licensing Department of Taizhou Environmental Protection Bureau Jiaojiang Branch Tel/fax: 0576-88836730

Address: No. 7 jianshe Road, Jiaojiang District, Taizhou City

Deadline for comments: 28 February 2020 solstice March 13, 2020 (letter based on postmark).

 

Information release unit: Zhejiang Tongli New Material Technology Co., LTD

Information release Date: February 28, 2020

Contact

Address: Binhai, Jiaojiang District, Taizhou City, Zhejiang Province
21 Chuangye Road, Industrial District
Tel:
400-189-4000
Email:wxy@tlgx.cn
Email:info@tlgx.cn

通力

All rights reserved © 2019  Zhejiang Tongli Modified Engineering Plastic Co., Ltd.  浙ICP备15002283号  Power:300.cn

  • Tel 400-189-4000
  • Email sales@tlgx.cn
  • Top